Hydraulic Scissor Lift Building Crane for Turbines Assemblying Working Platform
-
Modèle no.M4-020290-D4 / 2B
-
Nom de produitPlate-forme de travail de lifting des ciseaux hydrauliques
-
Capacité2000 kg
-
Coup de soulèvement2900 mm
-
Hauteur de près650 mm
-
Paquet de transportPalette en bois
-
Marque déposéeMarco
-
OrigineNingbo
-
Code HS8428909090
-
Capacité d'approvisionnement1200 pièces / an
-
ApplicationGrane d'atelier, grue à bord, grue d'entrepôt, grue de construction
-
Mécanisme de levageAscenseur à ciseaux
-
Capacité de compréhensionNiveau de poids spécial
-
MouvementsStationnaire
-
Type entraînéHydraulique
-
Mode de courseStationnaire
-
PersonnalisationDisponible | Demande personnalisée
-
CertificationCE, ISO 9001
-
Document
Hydraulic Scissor Lift Building Crane for Turbines Assemblying Working Platform
Product Description
Hydraulic Scissor Lift Working Platform for Turbines Assemblying
| Mechanical data | |
| Capacity | 2000 Kg |
| Lift stroke | 2900 mm |
| Lifting time | 53 s |
| Closed height | 650 mm |
| Weight | 5125 Kg |
? The table consist of 2 scissors and a working platform with 2 hydraulically driven flaps, making a hole in the middle.
? The table simplifies the assembly of turbines.
Marco Standard Components
All Marcolift standard lift tables are manufactured with high quality components to enhance reliability, durability and safety in operation.
| Pump | Bucher | Motor | Hoyer Denmark, protection IP55 |
| Control Panel | Marco standard control box | Sealing | Sweden, SKF |
| Cylinder | Marco, with rapture valve and damping | Limit switch | USA, Suns |
| Safety frame | Aluminum with limit switch | Scissor arm | Q345B, profile steel |
| Paint | Finland, Tikkurila | Hydraulic hose | USA, Eaton |
Marco Additional Component
In addition to the standard equipment of lift tables, it is possible to provide Marcolift lift table with a range of accessories to enhance safety, versatility, application and to simply handling.
Packaging & Shipping:
Main Loading Port: ShangHai or Ningbo
Production Delivery: 6-8 weeks (public holiday excluded)