Versatile Hydraulic Scissor Lift Platform with 3000kg Capacity and 2300mm Lift Stroke
-
Model no.M4-030230-D2/2H
-
Nama ProdukPlatform Kerja Gunting Hidraulik Scissor yang disesuaikan
-
Kapasitas3000kg
-
Lift stroke2300mm
-
Tinggi Tutup1200mm
-
Paket transportasiPalet kayu
-
Merek dagangMarco
-
AsalNingbo
-
Kode HS8428909090
-
Menyediakan kemampuan1200pieces/tahun
-
AplikasiCrane bengkel, crane kapal, crane gudang, crane bangunan
-
Mekanisme angkatGunting Lift
-
Daya dukungTingkat Berat Khusus
-
BergerakTidak bergerak
-
Tipe yang digerakkanHidrolik
-
Mode berjalanTidak bergerak
-
KustomisasiTersedia | Permintaan yang disesuaikan
-
SertifikasiCE, ISO 9001
-
Dokumen
Versatile Hydraulic Scissor Lift Platform with 3000kg Capacity and 2300mm Lift Stroke
Product Description
Customized Hydraulic Scissor Lift Working platform With Removable Segments
| Mechanical data | |
| Capacity | 3000kg |
| Platform size | Dia3100 or Dia3600mm |
| Lift stroke | 2300mm |
| Lifting time | 41s |
| Closed height | 1200mm |
| Weight | 2660kg |
This table will be used to brick up a furnace. It's operated by a built-in foot control.
The table can be levelled with an adjustable foot in each corner of the frame and by removing segments on the outside of table, the diameter can be changed.
Marco Standard Components
All Marcolift standard lift tables are manufactured with high quality components to enhance reliability, durability and safety in operation.
| Pump | Bucher | Motor | Hoyer Denmark, protection IP55 |
| Control Panel | Marco standard control box | Sealing | Sweden, SKF |
| Cylinder | Marco, with rapture valve and damping | Limit switch | USA, Suns |
| Safety frame | Aluminum with limit switch | Scissor arm | Q345B, profile steel |
| Paint | Finland, Tikkurila | Hydraulic hose | USA, Eaton |
Marco Additional Component
In addition to the standard equipment of lift tables, it is possible to provide Marcolift lift table with a range of accessories to enhance safety, versatility, application and to simply handling.
Packaging & Shipping:
Main Loading Port: ShangHai or Ningbo
Production Delivery: 6-8 weeks (public holiday excluded)