Hydraulic Driven Material Handling Equipment 2000kg Capacity Scissor Lift Working Platform
-
Model nr.M5, 7 020414-D2
-
Nazwa produktuHydrauliczna platforma robocza nożyc
-
Pojemność2000 kg
-
Uzdrowisko4140 mm
-
Zamknij wysokość857 mm
-
Pakiet transportowyDrewniana paleta
-
Znak firmowyMarco
-
PochodzenieNingbo
-
Kod HS8428909090
-
Możliwość Supply1200 miejsc/rok
-
AplikacjaŻuraw warsztatowy, dźwig statku, żuraw magazynowy, dźwig budowlany
-
Mechanizm podnoszeniaWinda nożycowa
-
Pojemność przenoszeniaSpecjalny poziom wagi
-
RuchyStacjonarny
-
Typ napędzanyHydrauliczny
-
Tryb działaniaStacjonarny
-
DostosowywanieDostępne | Dostosowane żądanie
-
OrzecznictwoCE, ISO 9001
-
Dokument
Hydraulic Driven Material Handling Equipment 2000kg Capacity Scissor Lift Working Platform
Product Description
| Mechanical data | |
| Capacity | 2000 kg |
| Lift stroke | 4140 mm |
| Lifting time | 32 s |
| Closed height | 857 mm |
The lift runsbetween two high racks on a driven flange wheel frame.
On top of the biglift we have a twin scissor lift with a roller conveyer, this lift serves as a workingarea for the operators,giving them an ergonomic working height.
This type of application we have delivered several timesbefore to different companies working in the woodindustry.
Marco Standard Components
All Marcolift standard lift tables are manufactured with high quality components to enhance reliability, durability and safety in operation.
| Pump | Bucher | Motor | Hoyer Denmark, protection IP55 |
| Control Panel | Marco standard control box | Sealing | Sweden, SKF |
| Cylinder | Marco, with rapture valve and damping | Limit switch | USA, Suns |
| Safety frame | Aluminum with limit switch | Scissor arm | Q345B, profile steel |
| Paint | Finland, Tikkurila | Hydraulic hose | USA, Eaton |
Marco Additional Component
In addition to the standard equipment of lift tables, it is possible to provide Marcolift lift table with a range of accessories to enhance safety, versatility, application and to simply handling.
Packaging & Shipping:
Main Loading Port: ShangHai or Ningbo
Production Delivery: 6-8 weeks (public holiday excluded)