Hydraulic Driven Material Handling Equipment 2000kg Capacity Scissor Lift Working Platform
-
Modelo no.M5, 7 020414-D2
-
Nome do produtoPlataforma de trabalho de elevador de tesoura hidráulica
-
Capacidade2000kg
-
Traço de elevação4140mm
-
Altura de perto857mm
-
Pacote de transportePalete de madeira
-
Marca registradaMarco
-
OrigemNingbo
-
Código HS8428909090
-
Habilidade da fonte1200 Pieces/Ano
-
AplicativoGuindaste de oficina, guindaste a bordo, guindaste de armazém, guindaste de construção
-
Mecanismo de elevaçãoElevador de tesoura
-
Capacidade de transporteNível de peso especial
-
MovimentosEstacionário
-
Tipo acionadoHidráulico
-
Modo de execuçãoEstacionário
-
PersonalizaçãoDisponível | Solicitação personalizada
-
CertificaçãoCE, ISO 9001
-
Documento
Hydraulic Driven Material Handling Equipment 2000kg Capacity Scissor Lift Working Platform
Product Description
| Mechanical data | |
| Capacity | 2000 kg |
| Lift stroke | 4140 mm |
| Lifting time | 32 s |
| Closed height | 857 mm |
The lift runsbetween two high racks on a driven flange wheel frame.
On top of the biglift we have a twin scissor lift with a roller conveyer, this lift serves as a workingarea for the operators,giving them an ergonomic working height.
This type of application we have delivered several timesbefore to different companies working in the woodindustry.
Marco Standard Components
All Marcolift standard lift tables are manufactured with high quality components to enhance reliability, durability and safety in operation.
| Pump | Bucher | Motor | Hoyer Denmark, protection IP55 |
| Control Panel | Marco standard control box | Sealing | Sweden, SKF |
| Cylinder | Marco, with rapture valve and damping | Limit switch | USA, Suns |
| Safety frame | Aluminum with limit switch | Scissor arm | Q345B, profile steel |
| Paint | Finland, Tikkurila | Hydraulic hose | USA, Eaton |
Marco Additional Component
In addition to the standard equipment of lift tables, it is possible to provide Marcolift lift table with a range of accessories to enhance safety, versatility, application and to simply handling.
Packaging & Shipping:
Main Loading Port: ShangHai or Ningbo
Production Delivery: 6-8 weeks (public holiday excluded)